BISON WALL PUTTY

Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.

Features & Benefits

1) No curing required

2) Makes your wall look super white

3) Gives your wall a super smooth finish

4) 100% resist flaking

5) Pure Eco-Friendly

Usage Instructions

1) Pre-wet wall surface before application of 1st coat.

2) Apply the first coat with a putty knife/trowel by drawing from bottom to top.

3) Apply the second coat after an interval of 1 day. Final thickness should be around 1.5-2.0 mm in 2 coats.

4) Smoothen the surface with fine emery paper 180-220 no. and remove loose particles minimum after 2 days of applying the 2nd/final coat.

5) Ideally you should wait for 3 days before applying subsequent primer coat, depending on climate conditions.

BISON WALL PUTTY-https://i-media.vyaparify.com/vcards/products/256282/product_1748090118_6831bd06ae68f.png Image

BISON WALL PUTTY

Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.



Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.

Features & Benefits

1) No curing required

2) Makes your wall look super white

3) Gives your wall a super smooth finish

4) 100% resist flaking

5) Pure Eco-Friendly

Usage Instructions

1) Pre-wet wall surface before application of 1st coat.

2) Apply the first coat with a putty knife/trowel by drawing from bottom to top.

3) Apply the second coat after an interval of 1 day. Final thickness should be around 1.5-2.0 mm in 2 coats.

4) Smoothen the surface with fine emery paper 180-220 no. and remove loose particles minimum after 2 days of applying the 2nd/final coat.

5) Ideally you should wait for 3 days before applying subsequent primer coat, depending on climate conditions.