Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.
Features & Benefits
1) No curing required
2) Makes your wall look super white
3) Gives your wall a super smooth finish
4) 100% resist flaking
5) Pure Eco-Friendly
Usage Instructions
1) Pre-wet wall surface before application of 1st coat.
2) Apply the first coat with a putty knife/trowel by drawing from bottom to top.
3) Apply the second coat after an interval of 1 day. Final thickness should be around 1.5-2.0 mm in 2 coats.
4) Smoothen the surface with fine emery paper 180-220 no. and remove loose particles minimum after 2 days of applying the 2nd/final coat.
5) Ideally you should wait for 3 days before applying subsequent primer coat, depending on climate conditions.
BISON WALL PUTTY
Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.
Bison Wall Putty is a powder-based, unique mixture of superfine white cement blended with flexible powdered polymer, cellulose, pigments and many other additives. It is used on both exterior and interior walls to give a smooth, undulating free surface.
Features & Benefits
1) No curing required
2) Makes your wall look super white
3) Gives your wall a super smooth finish
4) 100% resist flaking
5) Pure Eco-Friendly
Usage Instructions
1) Pre-wet wall surface before application of 1st coat.
2) Apply the first coat with a putty knife/trowel by drawing from bottom to top.
3) Apply the second coat after an interval of 1 day. Final thickness should be around 1.5-2.0 mm in 2 coats.
4) Smoothen the surface with fine emery paper 180-220 no. and remove loose particles minimum after 2 days of applying the 2nd/final coat.
5) Ideally you should wait for 3 days before applying subsequent primer coat, depending on climate conditions.